Dripping tap. Shower running cold. Bath that won't drain. Or planning a full bathroom renovation? George does it all — from quick repairs to complete bathroom installations across Bedford and 30-mile radius.
📞 Call Now — 07592 788731
Dripping tap, low pressure, mixer not regulating temperature, handle broken. Most tap repairs take 30-60 minutes. Replacements typically £40-80 labour + the tap. Bedford's hard water shortens tap life — limescale builds up inside the cartridge and seals fail. Quality brands (Bristan, Hansgrohe, Grohe, Vado) last much longer than budget options.
New shower install (electric, mixer, or power shower), replacing old units, fixing weak flow, repairing leaks at the shower head or wall connection. Mixer showers in Bedford homes need decent water pressure — if yours is poor, we'll recommend a pump or pressure-balancing shower.
New bath install, taps and waste replacement, fixing leaks under the bath, replacing seals where bath meets the wall. Standard acrylic or fibreglass bath install: £180-280 labour. Cast iron or freestanding baths take longer due to weight and access.
Replacing old toilet with new modern dual-flush, fixing wobbling toilets, repairing leaking cisterns, replacing flush mechanisms. For blockages, see our toilet unblocking page →
New basin install, replacing pedestals, fixing wobbling pedestal sinks, fixing leaking traps under the sink. Modern wall-hung basins increasingly common in new Bedford bathroom designs — require strong wall fixings, not just push-fit brackets.
Standard plumbed (runs off central heating), electric only, or dual fuel. Chrome, anthracite, white, or designer finishes. Sizes from 600×400mm to 1800×600mm. See radiator installation page for details →
The big one. Strip out old bathroom, replace floor and walls if needed (we recommend trusted Bedford tilers), install new bath/shower/toilet/basin/towel rail/lighting. Coordination of multiple trades.
Typical timeline: 1-2 weeks for a standard bathroom refit. Plumbing-only portion: 3-5 days. Tiling and decorating add separate time.
Worn cartridge or seal — limescale damage from hard water. Cartridge replacement is typical fix.
Mixer cartridge issue, or boiler/cylinder running out of hot water. Could also be cross-flow from cold pressure.
Hair buildup in trap. Sometimes solvable with simple unblocking — sometimes the trap itself needs replacing.
Old steel pipework corroding inside. Common in Bedford homes built 1950s-1970s. Usually only affects bathroom, not whole house.
Failed flush valve or fill valve in cistern. Wastes huge amounts of water if ignored. Fix is usually £40-80 in parts.
Wax ring seal between toilet and floor has failed. Needs lifting toilet, replacing seal, refixing.
Often discovered when downstairs ceiling shows damp. Bath waste seal or pipe joint failure.
Trap dried out (rare, usually unused bathroom) or waste pipe blockage causing siphoning.
Visit your bathroom, measure, discuss what you want to achieve. We can suggest layouts that work for your space.
Itemised: plumbing labour, fixtures (if we supply), recommended trades for tiling/electrics. Fixed price for plumbing portion.
Old bath, basin, toilet, shower removed. Old tiles removed if needed (we coordinate with tiler if you want). Pipework checked for any necessary replacement.
New pipework, drainage, electrics (we coordinate with electrician), waste runs. All hidden behind walls/floors before tiling starts.
Floor and walls tiled. We pause and return after tiling complete.
Bath, basin, toilet, shower, taps, towel rail all installed. Pressure tested. Sealed with quality silicone (not the cheap stuff).
Full system test — every fixture used, leaks checked, drainage verified. Customer walkthrough.
Tiling, decorating, and electrics are separate (we recommend trusted Bedford trades). Free survey for any install over £500.
Bedford · Kempston · Biggleswade · Sandy · Flitwick · Ampthill · Bromham · Sharnbrook · Milton Keynes · St Neots
From quick fixes to full installs. Free quotes for any work over £500. Call George today.
📞 Call George — 07592 788731